What California Can Learn From London About Rail Passenger Service


ntbraymer

By Noel T. Braymer

The red lines shows the roughly 12 miles of tunneling for Crossrail in the heart of London connecting west and east areas around London with direct no transfer needed service. The boxes by the stations shows rail connections to other services at those stations.

The largest infrastructure project in Europe, at a cost of almost 19 billion dollars is now almost finished in London. Called Crossrail, with construction starting in 2009, it has over 12 miles of new double tracked tunnel in the heart of central London. With this tunnel will be 73 miles of rail service mostly using existing rail lines outside of London, connected by tunnel giving run through service from the west to the east of London. This includes 7 new underground train stations in the heart of London. Initial service is expected by December of 2018. By December 2019 a new branch…

View original post 724 more words

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s